Ok i was right it is giving the wrong amount, i didn't add in the amount from the liquizit mining skill.
So the basic amount is 225 units the amount multiplyer when you show info on the miner is 121 percent which gives me 499 units which is what i am getting. When i load liquizit charges this should add a further 15 percent from the extensive liquizit skill the percentage amount does not change on the miner so i assume that the skill amount is added in the background, so i am thinking i should get around 530 units with the extra from the skill give or take a few as i know the hungerian maths thing is kind of weird.
Just tried this with titan ore i get 1664 which is base units at 750 times the 121 percent i have the same 15 percent bonus with the extensive titan ore skill which should take it to roughly 1792 units mined so either my calculations are way off or something (which is more than likely) or the skills are not applying.
So can someone check and confirm this for me please, maths isn't my greatest skill but i think i am roughly right.